Construction.

  • larnaca mall

  • This project was established with a group of European companies, and our role in the process was to build concrete and iron materials.

  • 60 M euros have been allocated for the construction of this project. It was completely constructed within 18 months

Construction of Larnaca tourist pier

The cost of the project is 2 million euros and it was constructed in 15 months. Our role was to prepare the sandy soil and reinforce it to withstand waves and soil erosion, and then do the concrete work.

business center nicosia town

It was built in 13 months at a cost of 5.3 million euros. Our role was engineering, excavation, construction and decoration work.

villas and small buildings

About the construction of villas and small buildings. Construction work was received from A to Z

Germany school limassol

The German School in Limassol is an edifice that includes playgrounds, theatres, a medical unit and a cinema. It was built over a period of 23 months and the cost was 15 million euros. Our role was in building concrete, paving roads and iron materials.