Construction.

  • larnaca mall

  • This project was established with a group of European companies, and our role in the process was to build concrete and iron materials.

  • 60 M euros have been allocated for the construction of this project. It was completely constructed within 18 months

An aerial view of a construction site with several buildings in progress, surrounded by roads, trees, and nearby a large body of water in an urban area.
show more
Man inspecting newly constructed concrete benches at a construction site on a sandy area with piles of dirt and construction materials around.
Logo with the name 'SABIH' inside a circle.
show more

Construction of Larnaca tourist pier

The cost of the project is 2 million euros and it was constructed in 15 months. Our role was to prepare the sandy soil and reinforce it to withstand waves and soil erosion, and then do the concrete work.

Modern high-rise residential buildings with balconies and greenery, set against city and ocean backgrounds during dusk and daytime.
Black logo with the words 'SABIH' and a design resembling a camera lens or circular shape.
show more

business center nicosia town

It was built in 13 months at a cost of 5.3 million euros. Our role was engineering, excavation, construction and decoration work.

Modern two-story house with an outdoor swimming pool and patio furniture, under a blue sky at dusk.
A black background with the name 'SABIH' in capital letters and a circle partially encircling the name.
show more

villas and small buildings

About the construction of villas and small buildings. Construction work was received from A to Z

Aerial view of a modern school campus with multiple buildings, sports courts, and surrounding greenery on hilly terrain under a clear blue sky.
A black graphic with the name 'SABIH' in stylized font and a circular design element.
show more

Germany school limassol

The German School in Limassol is an edifice that includes playgrounds, theatres, a medical unit and a cinema. It was built over a period of 23 months and the cost was 15 million euros. Our role was in building concrete, paving roads and iron materials.